DC engineering
±500kV Genan Line anti-dancing renovation project

1631851291384985.jpg

The new straight tower across the high-speed railway section is 21 meters higher than the old tower, which meets the safety operation of Jingjing Railway. At the same time, the independent stretch section is adopted in the crossing area, which also provides guarantee for the safe operation of the transmission line.

Tel
Products
Sms
Contact